North East Link - Roadheader Spoil Removal

Keeping roadheader excavation moving on North East Link

Supplying fully tunnel-spec articulated dump trucks to support continuous spoil removal operations behind roadheader excavation activities.

Location
Melbourne, Victoria
Project type
Tunnelling Infrastructure

The problem

Roadheader excavation works on North East Link required a fleet of tunnel-spec dump trucks capable of operating continuously within a live tunnelling environment between Manningham and Bulleen sites.

Focus Machinery purchased and configured new equipment to the Project’s specifications.

The project required:

  • 6 x 30 tonne articulated dump trucks
  • Full tunnel-spec compliance
  • Fire suppression systems fitted to all machines
  • HEPA cabin filtration systems for underground operation
  • Reliable production support behind continuous roadheader excavation

If the dump truck fleet was not operational, soil removal would slow roadheader production and directly impact tunnelling progress across this section of the project.

The solution

Focus Machinery supplied:

  • 6 x Komatsu HM300 articulated dump trucks
  • Full tunnel-spec machine packages
  • Integrated fire suppression systems
  • HEPA cabin filtration systems configured for tunnelling operations

The fleet was configured specifically for underground infrastructure conditions where compliance, operator protection and continuous production reliability were critical to programme delivery. This required more than standard fleet availability. The Project required specialist tunnel-ready machine preparation and compliance capability prior to mobilisation.

The results

The configured tunnel-spec fleet supported continuous spoil removal operations behind the roadheaders without equipment-related programme impacts.

  • Programme delivered ahead of time
  • Zero compliance events recorded
  • Continuous tunnelling support maintained
  • Client feedback confirmed Focus Machinery “set the benchmark”

The specialist configuration allowed tunnelling operations to continue efficiently while maintaining the compliance and safety requirements associated with underground infrastructure works.