See our capability at work.

Explore how equipment, attachments and technology have been configured to solve real challenges across major infrastructure projects.

Trusted by Australia's leading infrastructure contractors to support major project delivery.

AccionaCPB ContractorsJohn HollandLaing O'RourkeVentia
Case study library
13 case studies
Keeping roadheader excavation moving on North East Link — project photograph from the original case study

North East Link - Roadheader Spoil Removal

Keeping roadheader excavation moving

Continuous spoil removal behind a roadheader left no room for downtime or non-compliant plant. Six tunnel-spec dump trucks arrived configured and ready.

Read case study →
Tunnel-spec excavation for cross passage works — project photograph from the original case study

North East Link - Cross Passage Works

Tunnel-spec excavation for cross passage works

Cross-passage excavation inside an active TBM environment, where only fully tunnel-spec plant could go underground. An 8T breaker package was built for exactly that.

Read case study →
Precision grade control underground on North East Link — project photograph from the original case study

North East Link - Cut and Cover Tunnel Section

Precision grade control underground

Precise underground excavation needed grade control without GPS signal in confined conditions. Two reduced-radius Volvo excavators were configured with Trimble UTS control.

Read case study →
Supporting schedule-critical tunnelling excavation works — project photograph from the original case study

Lower Plenty Cut and Cover - Spark North East Link

Supporting schedule-critical tunnelling excavation works

Hard-rock production in a restricted excavation envelope against a fixed TBM breakthrough milestone. A short-stick 35t CAT with a Montabert hammer was configured for it.

Read case study →
Excavators, a skid-steer and crews working beneath a concrete deck between large concrete pillars during underground excavation

North East Link - Lower Plenty D-Walls

Maintaining TBM progress with a specialist rock saw

Cement-treated crushed rock up to 600mm thick was packing the blade and stalling the saw. We reconfigured the rock saw with tungsten-carbide pick teeth.

Read case study →
Eliminating manual reo cutting on D-wall breakout works — project photograph from the original case study

North East Link - Lower Plenty Cut & Cover

Eliminating manual reo cutting on D-walls

Reinforcing steel high on a D-wall face needed cutting inside a constrained shaft. A guarded excavator with rotating shears provided the reach for machine cutting.

Read case study →
Precision payload management on the Eastern Freeway Upgrade — project photograph from the original case study

Eastern Freeway - Bourke to Tram (EBTA)

Precision payload management

No space for a weighbridge on a constrained live site, with overloaded trucks the risk. Onboard weighing and 3D GPS came fitted to two excavators.

Read case study →
Specialist drilling support for Kananook Stabling Yard — project photograph from the original case study

Kananook Stabling Yard

Specialist drilling support

Unstable ground in a live rail corridor risked bore collapse. An excavator-mounted vibrator installed steel casings before auger drilling to maintain hole integrity.

Read case study →
Compact laser-controlled grading for confined infrastructure works — project photograph from the original case study

North East Link EBTA - Crane and Piling Pads

Compact laser-controlled grading

Crane and piling pads needed precise levels in a work zone too tight for a grader. A laser-controlled compact track loader did the trimming.

Read case study →
Cutting contaminated soil disposal costs by over $70,000. — project photograph from the original case study

Talbot Crescent Habitat Park

Cutting contaminated soil disposal costs by over $70,000

Contaminated soil disposal threatened the council's budget. An ALLU screening bucket on the client's excavator processed material on site, avoiding a larger screening plant.

Read case study →
Precision trenching in basalt for commercial works — project photograph from the original case study

Commercial concrete contractor - services trenching

Precision trenching in basalt

Services trenches through dense basalt risked slow excavation and overbreak with hammering. A diamond rock saw on the client's excavator cut precise edges instead.

Read case study →
Two Focus Machinery Cat excavators beside a rock face on the Eastern Freeway Upgrade, with a Hushtec-shrouded breaker and drum cutter

Eastern Freeway Upgrade - Burke to Hoddle

Low-noise rock excavation for night works

Night excavation near homes faced strict noise and vibration limits. Zero-swing excavators, a Hushtec-shrouded breaker and a drum cutter enabled work within those limits.

Read case study →
Supporting major rail breakthrough works — project photograph from the original case study

LXRP - Dandenong Rail Underpass Breakthrough

Supporting major rail breakthrough works

A tunnelling breakthrough beneath rail infrastructure needed continuous production in constrained conditions. Late-model excavators and specialist attachments arrived configured to the Ready-to-Dig standard.

Read case study →

Tell us about your project.

Complex scope. Tight timeline. Compliance-critical. That's where we start.

Scope your job
Tunnel boring machine cutterhead beside Focus Machinery excavators in a tunnel launch box